Buckingham Palace

Our involvement within the Royal Mews involved several blocks and plant rooms, extensive survey works were carried out including CCTV inspections of several of the many existing chimneys before any manufacture or installation was carried out. 

A typical block involved connections to Hoval Ultragas condensing boilers, each rising through a 45° elbow and connecting to a combined header system then running horizontally through a 90° & 45° elbows before connecting to a base tee rising vertically to termination within one of the many existing chimneys. 

Facts at A Glance

Client name: East West Connect Product Deltavent SF & Deltavent Twin Wall Time to complete: (36 weeks ) Location: London Interesting facts: There are 775 rooms, including 78 bathrooms, and 52 principal bedrooms.