Brighton Hospital

We designed and installed flues to both boilers and CHP

A total of 4 number boiler flues connected individually to Hoval SR Plus 3000 pressure jet boilers using our 575mm diameter (625mm o.d.) twinwall Deltavent System, each rising within a purpose build structure that was independently supported to the external structure of the main building terminating over 60m above ground level

Within the same structure connecting to 1No Cogenco CGC-1566CS-097-NG-50 CHP unit using our 450mm diameter (650mm o.d.) twin wall Deltavent product.

We had to ensure the longevity of the structure and that it could be accessed easily for maintenance.

Facts at a glance

•Client name: CrownHouse

•Product Deltavent Twinwall

•Project Value:

•Time to complete: 52 weeks

•Location: Brighton

Facts at A Glance

Key Points: 400m of Twin Wall Stainless Steel Flues. 60m tall access and support frame. Steel structure fixed to the building at each slab level.