PowerEx Konic Launch

A1 Flue Systems launches KONIC fire-rated flue. See it first at PowerEx Live London

A1 Flue Systems has launched KONIC, a fire-rated chimney and flue system for commercial and industrial plant. KONIC will be on show for the first time at PowerEx Live London on Thursday 10th December 2026, at the Park Plaza Hotel, Westminster Bridge, on table 36.

Where a flue passes through a fire-separated part of a building, KONIC keeps the compartment intact. The flue itself provides the fire protection, so there is less additional passive fire protection work on site, and a clear set of documents for building control and the fire authority.

KONIC is a double-wall stainless steel system with an AISI 316L liner, insulation and an AISI 304 outer wall. Its socketed modules join with an outer locking band and stay gastight without silicone seals. It is rated T600, H1 and W, so it suits wet, condensing conditions, and covers internal diameters from 80 to 900 mm.

The whole system was fire tested. Straight lengths, bends, tees, supports and fire-stop plates were tested to EN 1366-13 in vertical and horizontal runs, with fire from outside the flue and from inside it, and classified to EN 13501-2. KONIC reaches EI 30 to EI 240 depending on variant, orientation and fire direction. It is CE and UKCA marked to BS EN 1856-1.

The range comes in four insulation thicknesses. KON 25 and KON 50 are made as standard, and KON 75 and KON 100 are available on request. There are 78 components, from support plates to terminals.

KONIC is designed for plant rooms, risers, kitchens, and generator and CHP rooms in commercial, healthcare, education, industrial and multi-storey residential buildings. A1’s technical team sizes and designs each system and supplies the technical manual and flue calculations.

John Hamnett, Managing Director of A1 Flue Systems, said:

“A lot of our work is in plant rooms where the flue has to cross a fire wall or a floor on its way out. With KONIC, the flue keeps the fire rating itself, and every part is tested and marked, so there’s no guesswork for the designer, the installer or building control. PowerEx is the right place to show it first, because generators and CHP are where it’s needed most.”

See KONIC at PowerEx Live London
Thursday 10th December 2026 Park Plaza Hotel, Westminster Bridge, London SE1 7UT Table 36

Related News